Notice to Road Contractors
Posted on April 7, 2026
NOTICE TO ROAD CONTRACTORS – Town of Newbold
The Town of Newbold will be accepting proposals for the Reconstruction of Cedar Lane & Polke Lane and Reconstruction of Musky Bay Drive. Resurfacing of Soo Lake Road and Oak Drive. Along with the single chip sealing and flex patching of approximately 5.74 miles of various town roads.
Information is available from the Director of Public Works, Mark Fetzer, at 715-277-2432 or 715-499-5728.
Sealed bids for these projects will be accepted by the Newbold Town Clerk, 6103 Point Drive, Rhinelander, WI 54501, or in the Community Center drop box until 2 p.m., April 30, 2026. Sealed bids may also be presented at the Town Board Meeting at 6:00 p.m. on the same date.
Proposals will be opened and considered at the Newbold Town Board meeting on April 30, 2025, at 6:00 p.m., at the Newbold Community Center 4608 Apperson Dr., Rhinelander, WI 54501.
The Town of Newbold reserves the right to reject any or all proposals and will accept the proposal most advantageous to the Town.
Noticed this 7th day of April 2026 by Kim Gauthier, Newbold Town Clerk
(River News & Lakeland Times 4/10/2026 and 4/17/2026 editions)